A successful pilot in one department is not yet a complete roll-out plan. Other departments may differ in workplace setup, users, connectivity, cleaning routine and support.
Group similar workplaces
Create groups such as fixed treatment rooms, shared nursing stations, reception desks and mobile workstations. For each group, record which configuration and instructions apply.
This prevents a single pilot result being copied to all locations without verification.
Prepare technology and logistics
Check quantities, connections, cable routing, local keyboard layout and how devices are registered. Plan who will carry out installation and how old equipment will be disposed of or stored.
Make sure support staff know which models have been placed where.
Make instructions part of commissioning
Provide short, easy-to-find instructions for daily use and the local cleaning route. State where staff can go with questions, damage or faults.
Tailor the text to the exact model and avoid claims that are not in the current documentation.
Evaluate in phases
First roll out to a representative group and gather concrete issues. Then check whether the approach needs to be adjusted before the next department starts.
Use the same criteria as in the pilot and record any changes. This keeps the original choice well-founded.
Work with a phased roll-out board
Create an overview per department with workplace type, quantities, chosen configuration, local contact person, planned installation and evaluation date. Add a column for deviations from the pilot. This keeps it visible where additional research or different instructions are needed.
Plan the first roll-out in a department that is representative but where support can be quickly available. Gather questions during the first working days and incorporate structural answers into the instructions before the next group starts. This way, every phase is used to improve the process.
Do not close off a department until installation, registration, instructions and the first evaluation are complete. Delivering equipment alone does not indicate whether the new workplace is well embedded in IT and cleaning processes.
Practical checkpoints
- Departments are grouped by workplace type
- Quantities and configurations have been confirmed
- Local contact persons have been appointed
- Instructions and support have been planned
- Every phase has an evaluation and closure criterion
A phased roll-out makes differences between departments manageable and prevents a small problem from being immediately repeated on a large scale. The roll-out board also serves as the handover document for management and future expansion.
Frequently asked questions
Can one model be used across all departments?
This is possible, but only when the different workplaces, tasks and local requirements demonstrably correspond sufficiently.
What needs to be confirmed before roll-out?
At minimum, configuration, connectivity, instructions, cleaning route, registration, support and evaluation moment.
Last reviewed for accuracy: 19 October 2026. For cleaning, always follow the current instructions for the exact model and the local protocol.