A trial placement yields little if participants only indicate whether a keyboard feels “nice”. With criteria chosen in advance, the pilot becomes a useful basis for procurement and rollout.

Define the decision question in advance

Determine what the pilot needs to demonstrate. Is it about suitability for a shared nursing station, a dental practice, a mobile workstation, or a specific user group? Without a clear question, observations become difficult to weigh.

Record which outcome leads to proceeding, adjusting, or stopping.

Choose representative participants

Select users with different tasks and experience levels. Let the pilot take place during normal work activities, not only in a quiet demonstration setting.

Also involve IT and the person responsible for the cleaning process. They assess different risks than the day-to-day user.

Measure behaviour and practicality

Record typing errors, interruptions, reachability of functions, movement of the device, and performance of the cleaning routine. Use short, concrete observation questions instead of a long satisfaction survey.

Also log technical incidents and questions that arise during the pilot.

Decide and document

Discuss the outcomes per criterion. A strong result on one point does not automatically compensate for a blocker at IT or an impractical way of working.

Keep the pilot report with the procurement file and record any conditions for a potential rollout.

Use a simple scorecard

Create a scorecard containing only criteria that can lead to a decision. For each criterion, note the observation, any deviation, and the responsible assessor. A scale can help, but always add a brief explanation; the same score can mean something different for two participants.

Plan at least a baseline measurement and a final evaluation. For a longer trial, a brief interim check can reveal problems that would otherwise only be reported afterwards. Do not change criteria during the test without recording this, as the outcomes then become difficult to compare.

Afterwards, do not just summarise averages. A single blocker, such as incompatibility with IT policy or an impractical cleaning step, can be more important than several positive preference scores. Therefore, explicitly record which points count as a precondition.

Practical checkpoints

  • The decision question and workstation type are recorded
  • Participants represent day-to-day practice
  • Preconditions have been identified in advance
  • Incidents and observations are logged
  • Go, adjust, and stop criteria are clear

A good pilot does not produce a collection of loose opinions, but a traceable decision. With a compact scorecard, the organisation can explain what was tested, which limitations were found, and under what conditions a rollout is justified.

Frequently asked questions

How many users are needed?

Choose enough representative users and workstations to see the main variation; there is no universal number.

What is the most important pilot question?

Whether the combination of product, workstation, IT, and local working method is practical and manageable.

Last reviewed for accuracy: 19 October 2026. For cleaning, always follow the current instructions for the exact model and the local protocol.

Medigenic
EN
Medigenic assistant

How can I help? Ask about products, cleaning, a quotation or a 30-day trial.

Let Medigenic contact you

Privacy
Privacyoverzicht

Deze website maakt gebruik van cookies om u de best mogelijke gebruikerservaring te bieden. Cookie-informatie wordt opgeslagen in uw browser en vervult functies zoals u herkennen wanneer u terugkeert naar onze website en ons team helpen te begrijpen welke delen van de website u het meest interessant en nuttig vindt.